Montréal Sector18:25:23
Mars StationSol 410,894 08:50:30
The Belt7.60.70
Titan AnnexBeat 369.08
Corporate InstitutionalBank of Time0001
A calm station clinic: a patient by a porthole, a brass arm

Mech Veterans' Time Pension › Upgrade catalogue › Lumbar Swing Tube, Mark XII

Mech upgrade · Specification sheet

Lumbar Swing Tube, Mark XII

SKU
MU-64020
Maker
Belt Salvage Co-operative
Introduced
2905
A calm station clinic: a patient by a porthole, a brass arm
Plate I A calm station clinic: a patient by a porthole, a brass arm. From the Bank's archive.

A veteran who served as a signaller may ask for the lumbar swing tube to be fitted with a knock-code switch, so that a message can be tapped to the clinic without speaking. The code is printed on the card, and the clinic keeps a copy at each counter.

A Belt Salvage Co-operative lumbar swing tube from the Mark XII run has a faint line scored across its joint housing, cut before the part left the factory. The Bank has written to Belt Salvage Co-operative about the line twice without reply, so the part is fitted as it came, and the line is left where it is.

Specification

SpecificationValue
Mass25.6 kg
Hours between services10,067
Service life36 years
Lease9,300 s a day
Pension tiers eligibleI–III
Fitting time2 h

Leasing against your pension

The lease on a Mark XII lumbar swing tube is 9,300 seconds a day, and it is one of the few figures on the Bank's register that has never been raised. The clerk who first set it is sent a card on every anniversary of the lease, and sends one back.

Fitting

The heir who comes with a veteran to a fitting is asked to sit where the veteran can see them, and is given a pencil. The pencil is for writing down anything the veteran says that the heir thinks the fitter has missed. The fitter reads the list at the end.

Doc. ref. CIBT-2905-0F4A-3