Montréal Sector18:25:21
Mars StationSol 410,894 08:50:29
The Belt7.60.64
Titan AnnexBeat 369.08
Corporate InstitutionalBank of Time0001
A technician kneeling to adjust a veteran's brass leg in a station clinic

Mech Veterans' Time Pension › Upgrade catalogue › Hot-Headed Gearbox Lid, Mark IV

Mech upgrade · Specification sheet

Hot-Headed Gearbox Lid, Mark IV

SKU
MU-24597
Maker
Belt Salvage Co-operative
Introduced
2708
A technician kneeling to adjust a veteran's brass leg in a station clinic
Plate I A technician kneeling to adjust a veteran's brass leg in a station clinic. From the Bank's archive.

Parts for a couple who are to be parted by the post are fitted on one morning and sent by separate couriers on the same afternoon. The hot-headed gearbox lid for each is adjusted by tapping it once with the end of a pen, so that neither wearer goes a day without a fitter who knows the joint.

The fitter who has built the Belt Salvage Co-operative joints for thirty-four years stamps a small figure eight inside each housing, and has sent back a joint that left the bench without one. The Bank regards the figure eight as a warranty, and the fitter regards it as manners.

Specification

SpecificationValue
Mass13.7 kg
Hours between services14,087
Service life33 years
Lease19,560 s a day
Pension tiers eligibleII–III
Fitting time24 h

Leasing against your pension

A veteran who has moved between worlds pays the 19,560 seconds a day once, in whichever place the pension is paid that month. The lease follows the pension and not the address, and the clinic has never been asked to hold a lease in two places at once.

Fitting

A Belt Salvage Co-operative hot-headed gearbox lid for a veteran and a partner on another world is fitted on the same morning in two clinics, to two sets of measurements. The two are set in step by a call that lasts eleven minutes and is charged to nobody.

Doc. ref. CIBT-2708-F636-8