Branch
Concourse G
The stair rail at Concourse G has been polished so often that the grain shows through, and the oak is now a shade darker than the plans. The Bank regards this as the work of many hands, all of them depositors'.
Hail that falls in the yard is swept into a tin and kept in the strongroom from one season to the next. The branch holds no account for hail and has never opened one. The tin has been reweighed twice and found a little lighter each time, which the staff attribute to the tin.
Opening hours
| Counter | Local (watch) | Standard |
|---|---|---|
| Counter | 0.35 to 0.64 of the watch | 02:19:12 a watch |
| Memory Vault | 0.35 to 0.56 of the watch | 01:40:48 a watch |
| Automated Temporal Machines | Every watch | Always |
Branch staff
| Name | Role | Write to |
|---|---|---|
| Greta Valderrama | Branch Manager | g.valderrama2529@bankoftime.net |
| Rafe Nakashima | Pensions Officer | r.nakashima3895@bankoftime.net |
| Faro Nakashima-Quigley | Head Teller | f.nakashimaquigley5576@bankoftime.net |
| Jarrah Fennimore | Accounts Officer | j.fennimore7566@bankoftime.net |
| Oren Galloway | Chrono-Forex Dealer | o.galloway0515@bankoftime.net |
From the visitors' book
O. E., Io A custodian explained, very slowly, that I had overpaid the reference second by a fraction for most of my life. I am calmer now.
W. P., Titan This is my first visit off-world. I was told the vault would be cold. It is cold. The clerk gave me a blanket. I cried a little. Please do not record it.
This month
- 4 November: A cornet soloist with an account at Concourse G will practise scales in the reading room, with the door left open so that depositors may hear the same scale twice.
- 9 November: An auction of umbrellas left in the Concourse G lobby over three years will be held outside on Wednesday, and each buyer will be asked to say which of them is theirs.
Notices
The gallery ladder is being replaced by a stair of eleven treads and no apology. The old ladder is kept beside the lift, marked on each rung, so that depositors who prefer to climb may do so at their own risk until the works are signed off.
Ref. CIBT-3029-D89B-3
