Montréal Sector19:34:37
Mars StationSol 410,894 09:57:54
The Belt8.87.86
Titan AnnexBeat 372.09
Corporate InstitutionalBank of Time0001
Station garden deck: trees, a bandstand, a clock on a lamppost

Locations & ATMs › Mezzanine D, Vesta Station 6

Branch

Mezzanine D

Location
Vesta Station 6
Branch code
8299
Opened
2574
Station garden deck: trees, a bandstand, a clock on a lamppost
Plate I Station garden deck: trees, a bandstand, a clock on a lamppost. From the Bank's archive.

The inner rail of the upper gallery was fitted in 2574 from timber brought up from the lower yard. The timber has been replaced twice since, and the Bank describes the rail as original.

On the rotation after the early full frost of the local year, the youngest teller calls the hour from the step, and then the staff go inside to see whether it was right. It is not usually. The difference is entered in the ledger as a holiday.

Opening hours

CounterLocal (rotation)Standard
Counter0.36 to 0.65 of the rotation07:49:47 a rotation
Memory Vault0.36 to 0.57 of the rotation05:40:12 a rotation
Automated Temporal MachinesEvery rotationAlways

Branch staff

NameRoleWrite to
Yara KowalczykBranch Managery.kowalczyk9442@bankoftime.net
Dario InglewoodHead Tellerd.inglewood8716@bankoftime.net
Zeno ValderramaCompliance Officerz.valderrama3324@bankoftime.net
Teodor Fothergill-InglewoodSlippage Reconciliation Clerkt.fothergillinglewood1453@bankoftime.net

Lost property

Items are held at the counter for one Standard year and then passed to the Head Office. Bring the ticket number.

ItemFoundTicket
Empty violin case lined in green baize, a rosin cake in the lid pocket8 SepLP-7994
A fire brigade helmet with a dent in the crown shaped like the top of a lamp1 NovLP-9987
Hairbrush carved with a crescent, the bristles worn flat on one side only28 OctLP-3809

This month

  • 4 November: A visiting custodian from the Memory Vault brings to Mezzanine D one box for display, labelled with a name and no date, and visitors may write their guesses in the margin of the book.
  • 13 November: A pass-book belonging to a tenant of the Venus Cloudport, who kept one account at Mezzanine D for four centuries and never once withdrew, will be opened at its last entry for visitors to read.

The Vesta Station 6 annex has been "being refurbished" since before I opened my account, and the new floor is the old floor with a shinier name. I do not object, but I would like a receipt for the second coat of paint.

From the visitors' book, L. A., Io

The branch through the years

YearEvent
2574The branch opens.
2738The first box carried through the Mezzanine D sub-level door belonged to a depositor who asked that its contents be sealed and never named, and the custodian has signed for it every decade since.
2747The Titan dome band played a farewell at Mezzanine D on the last day of the old counter, and the tellers, who had heard the same six bars every quarter, could not add up a sum without them afterwards.
2757A notice was posted in the Vesta Station 6 hall requiring all drawers to be closed before the bell, and the notice outlived the bell, which was sold for scrap.
2777After a burst main flooded the Vesta Station 6 arcade, Mezzanine D opened its doors to the people standing in the water, and the queue ran out into the plaza in the sunshine for the first time in living memory.
2819A holder from the Mars habitats asked Mezzanine D to keep his voice for a year, since it would not carry in the thin air, and the teller sealed it in a flask and returned it at the next Martian sunrise.
2997The Mezzanine D adopted a standing order that the strongroom key be carried by a different clerk each sol, and the list of key-holders is now longer than the staff.

Notices

Heavy coats come off the rail for the warm season and are stored in the strongroom. A depositor who wants a coat back must ask for it by the colour of its buttons, which is the only way the Bank has found to keep track of coats through a change of season.

The night safe is being emptied at the second bell instead of the first lamp for the length of the works. Envelopes posted in the gap are held in the custodian's satchel, dated to the moment it is opened, and nobody is asked to sit on the satchel.

Ref. CIBT-3029-23AC-9