Montréal Sector19:35:01
Mars StationSol 410,894 09:58:16
The Belt8.88.60
Titan AnnexBeat 372.11
Corporate InstitutionalBank of Time0001
A space elevator's base station, a cable rising into the clouds

Locations & ATMs › Spur A, Kepler Anchorage 6

Branch

Spur A

Location
Kepler Anchorage 6
Branch code
7792
Opened
2977
A space elevator's base station, a cable rising into the clouds
Plate I A space elevator's base station, a cable rising into the clouds. From the Bank's archive.

The first carpenter's bench was left in the lower office when the works closed in 2977. It has planed every door in the branch since, one at a time, and the staff set its vice to the carpenter's height each morning in case he returns to finish the last of them.

A gallery over the hall was built on a scaffold that was never taken down, and has since become the gallery. Its planks are the floor, and their nail holes are still the branch's measure of the distance from the counter to the stair.

Opening hours

CounterLocal (rotation)Standard
Counter0.36 to 0.65 of the rotation07:49:47 a rotation
Memory Vault0.36 to 0.57 of the rotation05:40:12 a rotation
Automated Temporal MachinesEvery rotationAlways

Branch staff

NameRoleWrite to
Caio XiomaraBranch Managerc.xiomara2113@bankoftime.net
Yusra MbathaAccounts Officery.mbatha4604@bankoftime.net
Juno FairbrassClaims Assessorj.fairbrass4621@bankoftime.net
Jory WetherbyPensions Officerj.wetherby6017@bankoftime.net

The plaque in the Kepler Anchorage 6 vestibule lists the founders of this branch, and my own surname is among them, although I have never been to this town and the plaque is older than my family.

From the visitors' book, R. A., Singapore Sector

At this branch

  • Enquiries about a famous depositor's account, answered by a clerk who has read it twice
  • Storage of objects that fell from the sky, labelled by the hour found
  • Recalibration of clocks that have spent a holiday in the wrong city
  • Collection of sealed parcels addressed to the strongroom itself
  • Reward desk for returned stolen goods, paid in seconds at the side counter

This month

  • 5 November: A drill for the cellar fire at Spur A will ask every clerk to carry one ledger to the door and set it on the mat, where the custodian will count them.
  • 7 November: A talk on the lost-property table at Spur A lists the objects in the order they were entered, and finishes with the first, which has never been collected.
  • 15 November: A silver band from Kepler Anchorage 6 will play at Spur A on the afternoon the scaffolding comes down, and the crowd is asked to wait for the last note before it looks up.
  • 18 November: A plasterer from Kepler Anchorage 6 will restore the Spur A ceiling roses one leaf at a time from the stairs, and holders may watch but may not stand beneath the scaffold.

Notices

For the hot spell the strongroom door will be fitted with a stool, since the door swells in its frame and opens a tenth of a turn late. Depositors who wait by the door are asked to use the stool and not the hinge.

The river stair from the outer lot is closed for as long as the ladders stand. Crews should use the gate path, which is slower, flatter, and was never built to be a way round anything.

Leaf-fall at Kepler Anchorage 6 is expected on the rotation after next. The yard will be swept at each counter hour until the last leaf is down. A leaf found on the window shelf will be filed as a deposit of the season, and no fault will be found in the branch.

Ref. CIBT-3029-F2BB-8