Branch
Gate H
The works ledger for Gate H counts each renovation by the number of boxes moved out of its way, not by the bricks laid. Since 2772 the branch has moved several thousand boxes, and the masons' bricks, by their own count, come to much the same number, which the Bank regards as a balanced result.
When a teller at Kuiper Terrace 7 leaves for another counter, the pay-in stamp passes to the next name on the list in the lower office. A stamp that has been handed on four times still carries the first name pressed into its base, so the staff can see at a glance who began the work.
Opening hours
| Counter | Local (cycle) | Standard |
|---|---|---|
| Counter | 0.36 to 0.65 of the cycle | 12:10:48 a cycle |
| Memory Vault | 0.36 to 0.57 of the cycle | 08:49:12 a cycle |
| Automated Temporal Machines | Every cycle | Always |
Branch staff
| Name | Role | Write to |
|---|---|---|
| Jory Vantongeren | Branch Manager | j.vantongeren0488@bankoftime.net |
| Odile Szabo | Compliance Officer | o.szabo9661@bankoftime.net |
| Kofi Valderrama | Branch Manager | k.valderrama6215@bankoftime.net |
At this branch
- Currency conversion for Venus Cloudport holders, daylight hours
- Slippage waiver for holders of long-standing accounts
- Landing lights for visiting craft on the roof, switched off on request
This month
- 1 November: Anyone whose clock has stopped for no reason may bring it to Gate H for calibration, which will be carried out in the back room by a clerk who does not speak while working.
- 7 November: A Lyric Licensing clerk will sit at Gate H to confirm that no verse in the morning queue has been registered before, a check that has never once returned a yes.
- 12 November: The reverend Gwenllian Carr's last deposit, a silver spoon, goes on the counter this week with her name written on the ledger line and no sum beside it, as she asked.
- 14 November: A thief's jemmy, taken from the Gate H cellar door in the spring, will hang above the reading-room fireplace this month with a card naming the night clerk who took it from him.
Notices
Renovation of the upper counter is paused while a knock behind the strongroom wall is investigated. The crew have been told the job is finished and are waiting, with their tools, for the Bank to agree.
Ref. CIBT-3029-30CD-0
