Montréal Sector19:13:41
Mars StationSol 410,894 09:37:31
The Belt8.49.41
Titan AnnexBeat 371.18
Corporate InstitutionalBank of Time0001
A safe deposit hall with a glass floor over a planet

Locations & ATMs › Spur A, Kuiper Habitat 9

Branch

Spur A

Location
Kuiper Habitat 9
Branch code
7484
Opened
2893
A safe deposit hall with a glass floor over a planet
Plate I A safe deposit hall with a glass floor over a planet. From the Bank's archive.

On the local holiday of the Second Key the staff change the lock on the lower office and then change it back, so that everyone on the staff has held the new key once.

The main hall at Kuiper Habitat 9 is taller on the inside than the outside of the building suggests. A depositor standing in the hall will see one more row of windows than the street shows, and the Bank has been asked which is correct. It has answered that both are.

Opening hours

CounterLocal (turn)Standard
Counter0.34 to 0.63 of the turn03:18:10 a turn
Memory Vault0.34 to 0.55 of the turn02:23:30 a turn
Automated Temporal MachinesEvery turnAlways

Branch staff

NameRoleWrite to
Soren TranterBranch Managers.tranter7766@bankoftime.net
Nadia JuvonenClaims Assessorn.juvonen9175@bankoftime.net
Nils TranterSenior Accounts Officern.tranter0384@bankoftime.net

Lost property

Items are held at the counter for one Standard year and then passed to the Head Office. Bring the ticket number.

ItemFoundTicket
Tartan dog jacket, size small, with a brass bell sewn to the collar15 NovLP-6062
Bicycle bell that rings only in the key of the reference second13 SepLP-6432
Plaster bust of a Governor's left ear, found in the cellar and claimed by no head since18 OctLP-7759

What we offer here

  • Glazing of windows broken by storms or by gifts, free to holders
  • Witness statements from holders who saw a robbery begin and not end
  • Pension for a bell that no longer rings, paid quarterly to the parish

Getting here

Board the Kuiper Habitat 9 lift at the lower dock and get out at the first landing. The lift is painted red for reasons on file, and Spur A is at the top of the second flight.

Notices

Freight shuttles will use the lower yard for unloading from the next turn. The north gate is closed while the new drain is cut, and carts should be walked through the lower gate on foot.

The stair to the strongroom is being shored with new timbers while the glazier is at work. Staff carrying boxes will go up in single file, and any depositor met on the turn is asked to step back onto the landing with the box held out in front.

Ref. CIBT-3029-3999-8