Montréal Sector18:40:58
Mars StationSol 410,894 09:05:41
The Belt7.89.32
Titan AnnexBeat 369.76
Corporate InstitutionalBank of Time0001
A teller window beside an airlock, a planet sliding past the porthole

Locations & ATMs › Hall B, Huygens Ring 12

Branch

Hall B

Location
Huygens Ring 12
Branch code
6701
Opened
2712
A teller window beside an airlock, a planet sliding past the porthole
Plate I A teller window beside an airlock, a planet sliding past the porthole. From the Bank's archive.

The lot behind the branch was laid out for carts in 2712, and shuttles have since been fitted into its lines as best they can. The painted marks on the gravel are for guidance only, and the yard hand reads them as he likes.

The lift car takes six depositors or one trolley of ledgers, whichever arrives first. The brass plate inside lists both figures, and the ledger keeps a note of each trolley that was given precedence.

Opening hours

CounterLocal (cycle)Standard
Counter0.34 to 0.63 of the cycle12:10:48 a cycle
Memory Vault0.34 to 0.55 of the cycle08:49:12 a cycle
Automated Temporal MachinesEvery cycleAlways

Branch staff

NameRoleWrite to
Jarrah Underhill-ValderramaBranch Managerj.underhillvalderrama9189@bankoftime.net
Wren MbathaATM Custodianw.mbatha7375@bankoftime.net
Calla EskelandCustomer Relationsc.eskeland6209@bankoftime.net

This month

  • 3 November: Holiday bunting goes up across the Hall B lobby for the Balance Fair, and is cut down at closing by whichever clerk is tallest.
  • 8 November: The regulator at Hall B is set against the reference second in front of depositors on the last working day, a ceremony that takes four minutes and has never needed a second attempt.
  • 12 November: On Quarter Holiday the Hall B closes early so its clerks may watch the Huygens Ring 12 rockets from the roof, and the custodian will count them aloud.

Getting here

Look for the cannonball set into the wall of the Huygens Ring 12 square, cracked and bound with brass; Hall B is the grey house directly across from it.

Notices

The second-floor washroom is being retiled in a green that the contractor calls restful. The work will take one local cycle, though the contractor has described other jobs as restful and left them open for two.

Ref. CIBT-3029-39BC-7