Branch
Hall E
The stone trough by the gate was built for horses, and no horse has been stabled at Hall E since 2963. Shuttles drink from it on the way in. The yard book records it as a watering point at the rate for a horse, which the drivers pay without remark.
A shuttle parked at Hall E for a full local turn is entitled to a receipt. It is printed on the yard's own card, with space for the registration, the crew and the weather. The cards are kept in the yard and are never sent out.
Opening hours
| Counter | Local (turn) | Standard |
|---|---|---|
| Counter | 0.37 to 0.66 of the turn | 03:18:10 a turn |
| Memory Vault | 0.37 to 0.58 of the turn | 02:23:30 a turn |
| Automated Temporal Machines | Every turn | Always |
Branch staff
| Name | Role | Write to |
|---|---|---|
| Dov Eversley-Galloway | Branch Manager | d.eversleygalloway3233@bankoftime.net |
| Juno Ishikawa-Blue | Event II Liaison | j.ishikawablue3680@bankoftime.net |
| Sunniva Gunnarsdottir | Event II Liaison | s.gunnarsdottir3597@bankoftime.net |
| Tamsin Umberfield | Event II Liaison | t.umberfield4267@bankoftime.net |
At this branch
- Witness service for holders who must sign in front of a clock
- Translation of deposit slips into Positive Contact scripts
- Interview room for callers the Bank cannot find on its map
- Anonymous gift box, emptied each morning at the side door
- Lantern loan for holiday processions, returned before the next tide
This month
- 3 November: Pensioners from the Mech Veterans' scheme are invited to a quiet morning at Hall E, with chairs set out in the order of arrival.
- 5 November: A harvest fair on the Tempel Habitat 5 common sends a stall of preserves to Hall E, and the jars are sold at the counter at the price of the time it takes to open them.
From the visitors' book
Z. D., Oakland Sector I came down from the Phobos ore barges with a month's pay and a headache, and the clerk at Hall E counted my wages out in hours instead of coins. I thought it was a joke until I was paid in full.
A. D., New Orleans Sector The hoardings outside Hall E are painted with a picture of the finished building. The work was completed in the spring, and the picture is still there, with a small cone of scaffolding in the corner that nobody has been able to explain.
E. B., Phobos I was asked to wait in the new annex at Tempel Habitat 5 while the old one was finished, and I waited the whole of a year, and by the time it was ready I had forgotten what I came in to say, which I suspect was the plan.
H. K., Oakland Sector A coin was on the bench by the window, warm when you hold it, with a face I half recognise. I handed it in as instructed and was told it was my own; I am not sure I wanted it back.
Getting here
Through the glass vestibule on the eastern side of the square, under the rain shelter, is Hall E.
Notices
A new arch is being cut through the west range to the lane, so that carts may go through without turning. Until the keystone is set a teller with a flag will guide them, and the flag will be lowered for the bricklayer.
Ref. CIBT-3029-7DB5-8
