Branch
Arcade G
In the thaw the yard drains through a grate by the north gate, which is cleared by hand. The water that goes through it is entered in the yard book as a Standard deposit, and the Bank has never been able to say whose.
The floors of the building at Hygiea Station 6 are levelled against the chimney breast, which the architect set a metre above the yard. The upper floors have settled a little since, and the chimney has not, so the floors are now level with it and not with one another.
Opening hours
| Counter | Local (rotation) | Standard |
|---|---|---|
| Counter | 0.34 to 0.63 of the rotation | 07:49:47 a rotation |
| Memory Vault | 0.34 to 0.55 of the rotation | 05:40:12 a rotation |
| Automated Temporal Machines | Every rotation | Always |
Branch staff
| Name | Role | Write to |
|---|---|---|
| Cleo Ravensworth | Branch Manager | c.ravensworth5589@bankoftime.net |
| Fenna Whitlock | Slippage Reconciliation Clerk | f.whitlock1747@bankoftime.net |
| Ulla Inglewood | Head Teller | u.inglewood0010@bankoftime.net |
| Odile Lindqvist | Customer Relations | o.lindqvist3781@bankoftime.net |
At this branch
- Enquiries about a famous depositor's account, answered by a clerk who has read it twice
- Lock-changing for strongroom doors, done while you wait and watch
- Temporary counter while the east range is under works
- Refund of a robber's deposit when the robbery is called off
- Lanterns lent to holders walking home after a flood curfew, returned on the first dry morning
- Protective sheeting over the lobby carpet during the refit
The branch through the years
| Year | Event |
|---|---|
| 2696 | The branch opens. |
| 2779 | When the Hygiea Station 6 counter was taken out for renovation, the joiners found an older one underneath, still polished and working, and the branch kept both and billed the depositors for one. |
| 2793 | A Lagrange surveyor measuring the Arcade G annex for a new vault brought his own rule, marked in a unit the Bank had never adopted, and his figures came out correct in both. |
| 2865 | An elderly custodian at Arcade G retired after forty-one years, leaving a ledger of notes on which doors stuck in cold weather. |
| 2889 | After a choir had sung in the Arcade G vault for a week, the strongroom walls were found to hold the last note, and the custodian has since forbidden anyone from singing there. |
| 2953 | The Arcade G switched off the strongroom light during audits so that no one could watch the auditors counting, and the auditors have not since agreed on their own totals. |
Lost property
Items are held at the counter for one Standard year and then passed to the Head Office. Bring the ticket number.
| Item | Found | Ticket |
|---|---|---|
| Grey wool scarf, unlabelled, smelling faintly of cedar and diesel | 31 Oct | LP-0182 |
| Silver trowel engraved with the founding date, presented by a clerk who had not yet been appointed | 12 Nov | LP-0319 |
| Ferry ticket for a holiday crossing that sailed without its passengers, the stub still warm | 28 Sep | LP-9123 |
| Lunch pail painted with a single balance scale, a sandwich inside dated the day before the holiday was announced | 4 Sep | LP-3978 |
| Christening gown of white lawn, embroidered with a birth date later than the gown | 5 Oct | LP-0144 |
| Velvet pouch of uncut quarter-hours, one missing | 15 Oct | LP-2504 |
This month
- 3 November: Holders may inspect the chisel a burglar left in the Arcade G cellar after losing heart at the second door, and the note of apology is pinned beside it.
- 10 November: A demonstration of the hand pump in the Arcade G yard shows how the ground floor was emptied in the last fire, and the pump is worked by volunteers.
Notices
From the first local rotation of next month the counter will open at the first lamp and close at the first lamp of the following day, on one rota for the whole turn. The board by the door will show both sets of times. Depositors who came for the old close are asked to take the new one as a courtesy.
Cargo sledges unloading at the rear dock must clear the rail before the second rotation of the shift. A sledge still on the rail at the change will be moved, with its load, to the outer ring at the carrier's cost.
A section of the north gutter has come away from its bracket on the lane side. Until it is fixed, rain will run from the gutter onto the lane and not onto the step, which the Bank considers a provisional improvement.
Ref. CIBT-3029-6AC5-5
