Branch
Spur C

Every alteration at Tycho Terrace 2 has been carried out by the same two masons, who started a partition in the year 2590 and have been working on it since. The partition now divides the counter from itself, and depositors on either side are served at the same window by the same teller, who does not look up.
The back stair at Tycho Terrace 2 has a landing with a window onto the wall of the next building, and beside it a second window, painted over, that once looked at the yard. The painted pane is where most depositors stop to rest. No one knows which of the two windows the Bank meant to keep.
Opening hours
| Counter | Local (day) | Standard |
|---|---|---|
| Counter | 0.38 to 0.67 of the day | 06:57:36 a day |
| Memory Vault | 0.38 to 0.59 of the day | 05:02:24 a day |
| Automated Temporal Machines | Every day | Always |
Branch staff
| Name | Role | Write to |
|---|---|---|
| Wren Prendergast | Branch Manager | w.prendergast7568@bankoftime.net |
| Xan Blackwood | Claims Assessor | x.blackwood5477@bankoftime.net |
| Vito Oyelaran | ATM Custodian | v.oyelaran8216@bankoftime.net |
Lost property
Items are held at the counter for one Standard year and then passed to the Head Office. Bring the ticket number.
| Item | Found | Ticket |
|---|---|---|
| Pencilled note on the back of a deposit slip, asking politely for the strongroom and apologising for the clock | 17 Oct | LP-9014 |
| Porcelain shepherdess from a clock case, turned towards the wall where the clock was | 11 Sep | LP-6027 |
| Plain gold ring engraved inside with an account number and no name | 23 Oct | LP-0574 |
| Box of spare hands for a wall clock, none marked for any clock on the premises | 6 Nov | LP-9112 |
| Gazette dated the morning after the branch opened, folded around a chocolate coin | 3 Nov | LP-9159 |
| Ship's bell from a vessel missing from every register, its clapper tied up in twine | 15 Nov | LP-3795 |
Getting here
A brass plate on the wall at Tycho Terrace 2 says Branch over an arrow pointing at the ceiling, and Spur C is up there, although the building has no record of a floor above the third.
Notices
The north wall of the main hall is being re-pointed from the top down. The scaffold will stand one day longer than planned. Depositors who look up will see the masons at work, and the Bank asks that they do not wave.
Shuttles in the lot at Tycho Terrace 2 will be given their bay numbers by the yard hand in the order they arrived, not the order of their weight. Freight shuttles are asked to take the bays by the wall, and passenger shuttles the bays by the gate, though the yard hand will decide any case the crews dispute.
Ref. CIBT-3029-957D-9