Branch
Quay E
The branch's porter works both the vault floor and the front door and has been on the rota longer than the current manager. Directions are given by the porter, and are reliable.
The tellers at Kepler Ring 8 take their meal when the soup has cooled to the mark on the stove's thermometer. The Bank has checked the mark against the Standard hour and found it a little behind in the cold season and a little ahead in the warm. The soup has not been asked to correct this.
Opening hours
| Counter | Local (cycle) | Standard |
|---|---|---|
| Counter | 0.37 to 0.66 of the cycle | 12:10:48 a cycle |
| Memory Vault | 0.37 to 0.58 of the cycle | 08:49:12 a cycle |
| Automated Temporal Machines | Every cycle | Always |
Branch staff
| Name | Role | Write to |
|---|---|---|
| Bodhi Cardew | Branch Manager | b.cardew1720@bankoftime.net |
| Elif Yardley | Accounts Officer | e.yardley0488@bankoftime.net |
| Hamid Zamora | Memory Vault Custodian | h.zamora9098@bankoftime.net |
| Zola Ellsworth | Memory Vault Custodian | z.ellsworth7014@bankoftime.net |
| Wim Eskeland | Memory Vault Custodian | w.eskeland4646@bankoftime.net |
| Uma Voss-Ostrander | ATM Custodian | u.vossostrander7852@bankoftime.net |
From the visitors' book
F. S., London Sector The bench outside Kepler Ring 8 is worn in the shape of someone who sat there every morning for a long time, and I sat there too, and it fitted me better than I expected.
B. T., Ganymede The water came up to the second step at Kepler Ring 8 in the autumn, and the branch stayed open with a rowing boat tied at the door. I rowed in to bank and rowed out with my money in a waterproof pouch.
W. R., Ganymede I came in to report a stolen umbrella and was told the thief had been caught, reformed, and was now working the counter at Kepler Ring 8. He was very polite and very wet.
Getting here
During the renovation, Quay E is entered by the goods lift at the rear of Kepler Ring 8, and visitors are asked to step over the cement mixer and to ask nothing about who is mixing it.
From the branch register
| Year | Event |
|---|---|
| 2589 | The branch opens. |
| 2875 | Quay E adopted a rule in its first year that no clerk may sit while a depositor stands, and the rule has never been repealed, so the stools behind the counter were bolted to the floor. |
| 2933 | Dust-season water came up through the Kepler Ring 8 concourse and stopped the Quay E clocks for six sols, and every account was credited its interest without a single complaint being filed. |
| 3006 | A lift fire between the Quay E vault and its lobby trapped the night custodian for a quarter-hour, and he spent it reconciling the slippage ledger by torchlight, and it balanced. |
This month
- 1 November: Brymar College sends a visiting lecturer to Quay E for a six-week extension class on accrual and the ethics of compound interest.
- 10 November: An Authority inspector will spend a day at Quay E checking one clock against the reference second, and will not say which clock.
Notices
Every night box at Kepler Ring 8 is being re-keyed, one cycle at a time, starting with the lowest numbers. Depositors whose box is still waiting may use the old key. The new key will be sent to them in writing, and it will fit.
Ref. CIBT-3029-34D4-9
