Montréal Sector19:26:19
Mars StationSol 410,894 09:49:49
The Belt8.72.62
Titan AnnexBeat 371.73
Corporate InstitutionalBank of Time0001
Station promenade bank at closing time, shutters half down

Locations & ATMs › Gallery G, Herschel Relay 4

Branch

Gallery G

Location
Herschel Relay 4
Branch code
2399
Opened
2410
Station promenade bank at closing time, shutters half down
Plate I Station promenade bank at closing time, shutters half down. From the Bank's archive.

The branch's day runs from its first bell to its last, which means a depositor who arrives late in the local day is in fact early for the next. The tellers keep a tally of such arrivals, and the tally is always long.

The building at Gallery G was rebuilt in 2410 around its own counter, so the counter was never moved and never closed. The tellers describe the works as the longest unbroken transaction in the building's history, and nobody has come forward to dispute the description.

Opening hours

CounterLocal (turn)Standard
Counter0.33 to 0.62 of the turn03:18:10 a turn
Memory Vault0.33 to 0.54 of the turn02:23:30 a turn
Automated Temporal MachinesEvery turnAlways

Branch staff

NameRoleWrite to
Vito OstranderBranch Managerv.ostrander1561@bankoftime.net
Anouk RavensworthClaims Assessora.ravensworth8155@bankoftime.net
Priya DunmorePensions Officerp.dunmore9691@bankoftime.net

This month

  • 5 November: A paper map of the Herschel Relay 4 district, drawn in a child's hand, with the Gallery G set in the wrong street, will be pinned in the lobby for one month and not corrected.
  • 11 November: Holders who gave a gift to Gallery G in the last decade are asked to the counter on Thursday, where each object will be handed back for one minute and then returned to the strongroom with its receipt.

At this branch

  • Alarm bell tested on the first Thursday of each month, clapper unwrapped beforehand
  • Locksmith on call at the back gate, day and night
  • Temporary shutters for the north counter during the works, painted to match the plaster

Getting here

Coming in from the shuttle port, the Gallery G entrance faces the freight hall and is marked by a single potted fern.

Notices

The north dormer above the strongroom landing will be re-leaded for the length of the works. Light will be poor on the landing, and the strongroom will be lit from the stair lamp as before.

Ref. CIBT-3029-3EBE-1